Sound Channel Limited
Services: Employer's Agent
Build Value: £9m
Build Duration: 3 years (phased)
Shelby acted as Project Director, overseeing all pre and post construction delivery aspects, during this Croatian island development to create a retreat destination. New infrastructure was installed on the island including utilities, roads, and drainage. The 136-acre island is a holiday destination, with luxury glamping and lodges, an amphitheatre, swimming pool, restaurants, and bars.
Steve Allison, Director at Sound Channel, said:
“At the point of appointing Shelby, the project was in its infancy and needed to build some early momentum to breathe life and energy into the development. Phil (Taylor) did exactly that. With consideration of the island location and the logistical difficulties associated with getting people and materials to and from the island, it was great to have Phil on board to support our development needs. It was a pleasure working with Shelby and I confirm my general satisfaction with their service.”